IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0662 # 01 Y:2015 01 2015 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $41,305 $102,204 Not Implemented
OR0662 # 02 Y:2015 02 2015 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $15,820 $2,500 Not Implemented
OR0662 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,567 $0 Not Implemented
OR0662 # 04 Y:2015 04 2015 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $2,998 $864 Not Implemented
OR0662 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,683 $6,683 Implemented
OR0662 # 06 Y:2015 06 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,080 $302 Not Implemented
OR0662 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,058 $67,152 Not Implemented
OR0658 # 01 Y:2015 01 2015 MODIFY CURRENT INCENTIVE PROGRAM $22,712 $60,000 Not Implemented
OR0658 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $680,062 $427,000 Implemented
OR0658 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $54,203 $59,203 Implemented
OR0658 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,781 $0 Not Implemented
OR0657 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,205 $50,205 Implemented
OR0657 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $24,174 $32,596 Not Implemented
OR0657 # 03 Y:2015 03 2015 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $207,496 $694,826 Not Implemented
CO0714 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,700 $1,530 n/a
CO0714 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,340 $4,390 n/a
CO0714 # 03 Y:2015 03 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,650 $240 n/a
CO0714 # 04 Y:2015 04 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $9,310 $36,000 n/a
CO0714 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,690 $41,900 n/a
BS0062 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $6,803 $1,125 Not Implemented
BS0062 # 02 Y:2015 02 2015 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $450 $661 Not Implemented
BS0062 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $703 $447 Implemented
BS0062 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,584 $3,035 Not Implemented
BS0062 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $629 $15 Implemented
IP0044 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,883 $78 Implemented