IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0129 # 01 Y:2014 01 2014 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $72,413 $8,000 Not Implemented
UA0129 # 02 Y:2014 02 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $34,652 $100 Implemented
UA0129 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,794 $38,871 Not Implemented
UA0129 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $263 $331 Implemented
UA0129 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $44,851 $100 Implemented
UA0129 # 06 Y:2014 06 2014 UPGRADE CONTROLS ON COMPRESSORS $35,918 $45,024 Not Implemented
UA0129 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $15,672 $5,250 Not Implemented
UA0129 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,212 $7,095 Implemented
AM0665 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,280 $17,710 Implemented
AM0665 # 02 Y:2014 02 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,930 $4,000 Not Implemented
AM0665 # 03 Y:2014 03 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $34,980 $10,000 Implemented
AM0665 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,080 $2,000 Implemented
AM0665 # 05 Y:2014 05 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,020 $1,485 Implemented
AM0665 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,235 $10 Not Implemented
AM0665 # 07 Y:2014 07 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $310 $0 Not Implemented
OR0635 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,475 $7,174 Not Implemented
OR0635 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,287 $1,628 Not Implemented
OR0635 # 03 Y:2014 03 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $56,191 $56,191 Not Implemented
OR0635 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,844 $15,843 Not Implemented
OR0635 # 05 Y:2014 05 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $23,961 $9,068 Not Implemented
OR0635 # 06 Y:2014 06 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $181,002 $170,561 Not Implemented
OR0635 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $40,819 $43,800 Not Implemented
OR0634 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $102,712 $87,114 Not Implemented
OR0634 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,951 $0 Not Implemented
OR0634 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101,299 $258,445 Not Implemented