IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0702 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,102 $2,210 Not Implemented
MA0702 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $868 $3,000 Implemented
UA0088 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,558 $22,841 Implemented
UA0088 # 02 Y:2012 02 2012 USE PHOTOCELL CONTROLS $687 $651 Implemented
UA0088 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,088 $2,500 Implemented
UA0088 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,268 $1,600 Implemented
UA0088 # 05 Y:2012 05 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,103 $160 Implemented
UA0088 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $306 Not Implemented
UA0088 # 07 Y:2012 07 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $856 $2,722 Implemented
UA0088 # 08 Y:2012 08 2012 REPAIR AND ELIMINATE STEAM LEAKS $1,371 $2,780 Implemented
UA0088 # 09 Y:2012 09 2012 OPTIMIZE PLANT POWER FACTOR $13,879 $21,400 Not Implemented
UM0414 # 01 Y:2012 01 2012 REDUCE VENTILATION AIR $15,347 $20,200 Not Implemented
UM0414 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,787 $200 Not Implemented
UM0414 # 03 Y:2012 03 2012 OPTIMIZE PLANT POWER FACTOR $6,520 $10,000 Not Implemented
UM0414 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $449 $100 Not Implemented
UM0414 # 05 Y:2012 05 2012 REDUCE VENTILATION AIR $9,526 $0 Not Implemented
UM0414 # 06 Y:2012 06 2012 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $11,148 $7,000 Implemented
UM0414 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,440 $10,000 Not Implemented
CO0666 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,240 $155,860 Not Implemented
CO0666 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,710 $1,000 Implemented
CO0666 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,090 $430 Not Implemented
CO0666 # 04 Y:2012 04 2012 OPTIMIZE PLANT POWER FACTOR $30,160 $56,610 Not Implemented
CO0666 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,630 $32,970 Not Implemented
CO0666 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,730 $13,270 Not Implemented
BS0005 # 01 Y:2012 01 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $265 $555 Not Implemented