Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

398

matching recommendations
Reset
SIC 242 Sawmills And Planing Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0486 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $24,600 $800 Not Implemented
OR0486 # 02 Y:2005 02 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $75,000 $50,000 Implemented
OR0486 # 01 Y:2005 01 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $536,590 $3,000 Not Implemented
OR0485 # 08 Y:2005 08 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $735 $2,410 Not Implemented
OR0485 # 07 Y:2005 07 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $64,000 $134,000 Not Implemented
OR0485 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,250 $0 Not Implemented
OR0485 # 05 Y:2005 05 2005 OPTIMIZE PLANT POWER FACTOR $13,480 $12,250 Not Implemented
OR0485 # 04 Y:2005 04 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $64,700 $19,500 Not Implemented
OR0485 # 03 Y:2005 03 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,760 $15,400 Not Implemented
OR0485 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,180 $0 Not Implemented
OR0485 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,420 $6,500 Not Implemented
OR0471 # 12 Y:2004 12 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $104,895 $422,500 Not Implemented
OR0471 # 11 Y:2004 11 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,291 $27,750 Implemented
OR0471 # 10 Y:2004 10 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $251,508 $60,000 Not Implemented
OR0471 # 09 Y:2004 09 2004 INSTALL SENSORS TO DETECT AND AVOID JAMS $6,000 $1,000 Implemented
OR0471 # 08 Y:2004 08 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,470 $9,300 Not Implemented
OR0471 # 07 Y:2004 07 2004 OPTIMIZE PLANT POWER FACTOR $18,220 $20,000 Not Implemented
OR0471 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $44,000 $92,000 Not Implemented
OR0471 # 05 Y:2004 05 2004 INSTALL SENSORS TO DETECT AND AVOID JAMS $102,700 $77,400 Not Implemented
OR0471 # 04 Y:2004 04 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $58,650 $10,000 Implemented
OR0471 # 03 Y:2004 03 2004 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,600 $7,100 Implemented
OR0471 # 02 Y:2004 02 2004 UPGRADE CONTROLS ON COMPRESSORS $22,560 $8,500 Implemented
OR0471 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,840 $4,840 Implemented
OR0443 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $563,900 $520,900 n/a
OR0443 # 02 Y:2003 02 2003 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $46,744 $15,000 Not Implemented