Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
103
matching recommendationsSIC | 242 | Sawmills And Planing Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0225 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,707 | $200 | Implemented |
LE0225 # 02 Y:2005 | 02 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $17,500 | $50,000 | Implemented |
LE0225 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,558 | $100 | Implemented |
LE0225 # 08 Y:2005 | 08 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,118 | $350 | Not Implemented |
LE0225 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,090 | $35,595 | Implemented |
LE0225 # 03 Y:2005 | 03 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $11,161 | $2,800 | Not Implemented |
LE0225 # 05 Y:2005 | 05 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,158 | $800 | Not Implemented |
LE0225 # 01 Y:2005 | 01 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $28,200 | $2,000 | Not Implemented |
LE0225 # 07 Y:2005 | 07 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,914 | $2,500 | Implemented |
OR0486 # 10 Y:2005 | 10 | 2005 | INSTALL AUTOMATIC PACKING EQUIPMENT | $25,000 | $49,000 | Implemented |
OR0486 # 02 Y:2005 | 02 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $75,000 | $50,000 | Implemented |
OR0486 # 03 Y:2005 | 03 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $24,600 | $800 | Not Implemented |
OR0486 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,000 | $0 | Not Implemented |
OR0486 # 01 Y:2005 | 01 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $536,590 | $3,000 | Not Implemented |
OR0486 # 12 Y:2005 | 12 | 2005 | INSULATE FEEDWATER TANK | $1,800 | $1,500 | Implemented |
OR0486 # 06 Y:2005 | 06 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $6,360 | $0 | Not Implemented |
OR0486 # 09 Y:2005 | 09 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,350 | $3,050 | Implemented |
OR0486 # 11 Y:2005 | 11 | 2005 | USE PHOTOCELL CONTROLS | $2,700 | $1,300 | Implemented |
OR0486 # 07 Y:2005 | 07 | 2005 | DEVELOP STANDARD OPERATING PROCEDURES | $5,000 | $40 | Not Implemented |
OR0486 # 08 Y:2005 | 08 | 2005 | REDUCE OR ELIMINATE WASTE | $4,680 | $65 | Not Implemented |
OR0486 # 05 Y:2005 | 05 | 2005 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $0 | $6,900 | Implemented |
AM0495 # 08 Y:2005 | 08 | 2005 | USE PHOTOCELL CONTROLS | $280 | $33 | Implemented |
AM0495 # 07 Y:2005 | 07 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,200 | $3,750 | Implemented |
AM0495 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,250 | $200 | Implemented |
AM0495 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,990 | $0 | Implemented |