IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
SIC 242 Sawmills And Planing Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0225 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,707 $200 Implemented
LE0225 # 02 Y:2005 02 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $17,500 $50,000 Implemented
LE0225 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,558 $100 Implemented
LE0225 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,118 $350 Not Implemented
LE0225 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,090 $35,595 Implemented
LE0225 # 03 Y:2005 03 2005 INSTALL TIMERS AND/OR THERMOSTATS $11,161 $2,800 Not Implemented
LE0225 # 05 Y:2005 05 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,158 $800 Not Implemented
LE0225 # 01 Y:2005 01 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $28,200 $2,000 Not Implemented
LE0225 # 07 Y:2005 07 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,914 $2,500 Implemented
OR0486 # 10 Y:2005 10 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $25,000 $49,000 Implemented
OR0486 # 02 Y:2005 02 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $75,000 $50,000 Implemented
OR0486 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $24,600 $800 Not Implemented
OR0486 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,000 $0 Not Implemented
OR0486 # 01 Y:2005 01 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $536,590 $3,000 Not Implemented
OR0486 # 12 Y:2005 12 2005 INSULATE FEEDWATER TANK $1,800 $1,500 Implemented
OR0486 # 06 Y:2005 06 2005 RECOVER AND REUSE WASTE MATERIAL $6,360 $0 Not Implemented
OR0486 # 09 Y:2005 09 2005 OPTIMIZE PLANT POWER FACTOR $3,350 $3,050 Implemented
OR0486 # 11 Y:2005 11 2005 USE PHOTOCELL CONTROLS $2,700 $1,300 Implemented
OR0486 # 07 Y:2005 07 2005 DEVELOP STANDARD OPERATING PROCEDURES $5,000 $40 Not Implemented
OR0486 # 08 Y:2005 08 2005 REDUCE OR ELIMINATE WASTE $4,680 $65 Not Implemented
OR0486 # 05 Y:2005 05 2005 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $0 $6,900 Implemented
AM0495 # 08 Y:2005 08 2005 USE PHOTOCELL CONTROLS $280 $33 Implemented
AM0495 # 07 Y:2005 07 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,200 $3,750 Implemented
AM0495 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,250 $200 Implemented
AM0495 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,990 $0 Implemented