IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,883

matching recommendations
Reset
SIC 2421 Sawmills And Planing Mills, General
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0256 # 02 Y:1985 02 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,103 $74 Not Implemented
TN0256 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $1,062 $244 Not Implemented
TN0256 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $769 $50 Implemented
TN0256 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $457 $245 Implemented
GT0247 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $613 $562 Implemented
GT0247 # 02 Y:1985 02 1985 INSTALL SET-BACK TIMERS $1,091 $0 Not Implemented
GT0247 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,199 $0 Implemented
GT0247 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,042 $150 Implemented
GT0247 # 05 Y:1985 05 1985 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $859 $1,000 Implemented
LT0011 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $355 $577 Implemented
LT0011 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $551 $408 Implemented
LT0011 # 03 Y:1984 03 1984 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,477 $762 Not Implemented
LT0011 # 04 Y:1984 04 1984 RECOVER WASTE HEAT FROM EQUIPMENT $799 $348 Not Implemented
LT0011 # 05 Y:1984 05 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $822 $840 Implemented
LT0011 # 06 Y:1984 06 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $30,530 $69,200 Not Implemented
TN0209 # 01 Y:1984 01 1984 IMPROVE LUBRICATION PRACTICES $117 $0 Implemented
TN0209 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $106 $50 Implemented
TN0209 # 03 Y:1984 03 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $59 $215 Implemented
KU0074 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,439 $1,400 Implemented
KU0074 # 02 Y:1983 02 1983 REDUCE FLUID FLOW RATES $26,145 $2,920 Implemented
KU0074 # 03 Y:1983 03 1983 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $14,284 $5,200 Implemented
KU0074 # 04 Y:1983 04 1983 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,370 $1,756 Implemented
KU0074 # 05 Y:1983 05 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $1,448 $358 Implemented
KU0074 # 06 Y:1983 06 1983 REPAIR AND ELIMINATE STEAM LEAKS $2,905 $100 Implemented
KU0074 # 07 Y:1983 07 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $841 $238 Implemented