IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 2421 Sawmills And Planing Mills, General
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0652 # 03 Y:2011 03 2011 USE SOLAR HEAT TO HEAT MAKE-UP AIR $7,530 $35,420 Not Implemented
CO0652 # 02 Y:2011 02 2011 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $7,570 $13,550 Not Implemented
CO0652 # 01 Y:2011 01 2011 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $11,990 $34,320 Implemented
CO0652 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,100 $870 Implemented
CO0647 # 05 Y:2011 05 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $2,420 $27,500 Not Implemented
CO0647 # 04 Y:2011 04 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $790 $1,410 Not Implemented
CO0647 # 03 Y:2011 03 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $950 $600 Implemented
CO0647 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,490 $520 Implemented
CO0647 # 01 Y:2011 01 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,240 $5,950 Not Implemented
CO0239 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,870 $680 Implemented
CO0239 # 10 Y:1992 10 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $290 Implemented
CO0239 # 09 Y:1992 09 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $340 $150 Implemented
CO0239 # 08 Y:1992 08 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $630 $2,360 Implemented
CO0239 # 07 Y:1992 07 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $670 $125 Implemented
CO0239 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,040 $0 Implemented
CO0239 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,730 $670 Implemented
CO0239 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,760 $500 Implemented
CO0239 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,330 $17,600 Implemented
CO0239 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $13,400 $10,830 Implemented
CO0074 # 10 Y:1986 10 1986 INSTALL TIMERS AND/OR THERMOSTATS $638 $200 Not Implemented
CO0074 # 09 Y:1986 09 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,571 $500 Implemented
CO0074 # 06 Y:1986 06 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,296 $400 Implemented
CO0074 # 05 Y:1986 05 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,018 $0 Implemented
CO0074 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $1,724 $2,000 Not Implemented
CO0074 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $16,456 $0 Implemented