IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 2421 Sawmills And Planing Mills, General
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0606 # 10 Y:2018 10 2018 DEVELOP A REPAIR/REPLACE POLICY $27,412 $65,590 Implemented
NC0606 # 09 Y:2018 09 2018 REDESIGN PROCESS $31,091 $15,000 Implemented
NC0606 # 08 Y:2018 08 2018 REPAIR OR REPLACE STEAM TRAPS $11,945 $10,500 Implemented
NC0606 # 07 Y:2018 07 2018 INCREASE AMOUNT OF CONDENSATE RETURNED $205,770 $100,000 Not Implemented
NC0606 # 06 Y:2018 06 2018 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $21,044 $500 Implemented
NC0606 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,456 $119,341 Implemented
NC0606 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $369 $547 Implemented
NC0606 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,868 $20,154 Implemented
NC0606 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,634 $200 Implemented
NC0606 # 05 Y:2018 05 2018 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $48,482 $180,000 Implemented
NC0445 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $575 $100 Implemented
NC0445 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,698 $7,891 Implemented
NC0445 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $336 $126 Implemented
NC0445 # 04 Y:2012 04 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $17,271 $73,750 Not Implemented
NC0445 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,573 $7,197 Not Implemented
NC0445 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,196 $0 Implemented
OD0136 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $232 $862 Implemented
OD0136 # 02 Y:1999 02 1999 DISCONNECT BALLASTS $1,083 $8,452 Implemented
OD0136 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $784 $1,027 Not Implemented
OD0136 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $622 $800 Implemented
OD0136 # 05 Y:1999 05 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,069 $1,870 Not Implemented
OD0136 # 06 Y:1999 06 1999 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $7,187 $2,200 Not Implemented
TN0437 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,002 $2,030 Implemented
TN0437 # 02 Y:1991 02 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,502 $150 Implemented
TN0437 # 03 Y:1991 03 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,176 $0 Implemented