Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 2421 | Sawmills And Planing Mills, General |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0729 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $14,812 | $38,672 | Implemented |
OR0729 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,737 | $17,500 | Not Implemented |
OR0729 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,791 | $13,791 | Implemented |
OR0729 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,586 | $8,701 | Not Implemented |
OR0729 # 05 Y:2019 | 05 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,870 | $566,544 | Not Implemented |
BS0122 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,702 | $8,000 | Not Implemented |
BS0122 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,341 | $1,630 | Not Implemented |
BS0122 # 04 Y:2019 | 04 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $882 | $15 | Not Implemented |
BS0122 # 05 Y:2019 | 05 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,219 | $5,725 | Not Implemented |
BS0122 # 06 Y:2019 | 06 | 2019 | BURN A LESS EXPENSIVE GRADE OF FUEL | $105,689 | $93,600 | Not Implemented |
BS0122 # 07 Y:2019 | 07 | 2019 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $322,973 | $1,002,400 | Not Implemented |
BS0122 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,031 | $14,455 | Not Implemented |
UA0210 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,983 | $12,313 | Implemented |
UA0210 # 04 Y:2019 | 04 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,278 | $14,550 | Not Implemented |
UA0210 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,087 | $1,345 | Implemented |
UA0210 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,939 | $100 | Implemented |
WV0571 # 01 Y:2019 | 01 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $21,112 | $1,000 | Implemented |
WV0571 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $17,040 | $19,272 | Implemented |
WV0571 # 03 Y:2019 | 03 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,334 | $3,500 | Implemented |
WV0571 # 04 Y:2019 | 04 | 2019 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $11,713 | $2,200 | Not Implemented |
WV0571 # 05 Y:2019 | 05 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $5,475 | $8,000 | Not Implemented |
WV0571 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,044 | $0 | Implemented |
WV0571 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,135 | $4,150 | Not Implemented |
WV0571 # 08 Y:2019 | 08 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $3,383 | $763 | Implemented |
WV0571 # 09 Y:2019 | 09 | 2019 | INSULATE BARE EQUIPMENT | $1,597 | $8,060 | Implemented |