IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 2426 Hardwood Dimension & Flooring Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0180 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $2,816 $3,700 Implemented
MZ0180 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,512 $23,625 Implemented
MZ0180 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,237 $900 Implemented
MZ0180 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $772 $1,500 Not Implemented
MZ0180 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,163 $10,500 Not Implemented
MZ0180 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,380 $0 Implemented
MO0267 # 06 Y:1999 06 1999 MOVE PRODUCT USING MECHANICAL MEANS $38,556 $5,053 Not Implemented
MO0267 # 05 Y:1999 05 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $24,480 $0 Not Implemented
MO0267 # 04 Y:1999 04 1999 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $0 $0 Implemented
MO0267 # 03 Y:1999 03 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,700 $0 Implemented
MO0267 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $436 $0 Implemented
MO0267 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,983 $4,472 Implemented
MO0219 # 07 Y:1997 07 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $50,000 $2,000 Implemented
MO0219 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $297 $40 Implemented
MO0219 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $870 $0 Not Implemented
MO0219 # 04 Y:1997 04 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,769 $3,743 Implemented
MO0219 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,600 $10,000 Not Implemented
MO0219 # 02 Y:1997 02 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $5,072 $15,000 Implemented
MO0219 # 01 Y:1997 01 1997 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $14,170 $25,000 Implemented
MO0093 # 01 Y:1993 01 1993 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $167,626 $180,000 Not Implemented
MO0093 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,643 $464 Implemented
MO0093 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $994 $369 Implemented
MO0093 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,300 $5,978 Implemented
MO0093 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,313 $1,005 Implemented
MO0093 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,564 $25,288 Implemented