Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1999 |
Principal Product | Hardwood Oak Flooring |
NAICS | n/a |
SIC | 2426 - Hardwood Dimension & Flooring Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 180,972 |
Annual Production | 12,000,000 Pieces |
Production Hrs. Annual | 2,040 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $57,183 | 1,414,713 | kWh | $0.04 |
Electricity Demand | $42,066 | 998 | kW-months/year | $42.15 |
Electricity Fees | $4,693 | - | $ | - |
TOTAL ENERGY COSTS | $115,052 | |||
RECOMMENDED SAVINGS* | $68,155 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,119 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,983 Cost: $4,472 |
$1,347 | 30,774 | $636 | 15 | - | - | - | - | - | - |
$1,347 30,774 kWh |
$636 15 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $436 Cost: - |
$297 | 6,741 | $139 | 3 | - | - | - | - | - | - |
$297 6,741 kWh |
$139 3 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $2,700 Cost: - |
- | - | - | - | $2,700 | 60 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,700 60 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: - Cost: - |
- | - | - | - | - | 164,080 | - | - | - | - |
- - kWh |
- - kW-months/year |
- 164,080 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $24,480 Cost: - |
- | - | - | - | - | - | - | - | $24,480 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$24,480 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.423 MOVE PRODUCT USING MECHANICAL MEANS |
Savings: $38,556 Cost: $5,053 |
- | - | - | - | - | - | $38,556 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$38,556 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $68,155 Cost: $9,525 |
$1,644 | 37,515 | $775 | 18 | $2,700 | 164,140 | $38,556 | - | $24,480 | - | $1,644 37,515 kWh |
$775 18 kW-months/year |
$2,700 164,140 lb |
$38,556 - $ |
$24,480 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,119 Cost: $4,472 |
$1,644 | 37,515 | $775 | 18 | $2,700 | 164,140 | - | - | - | - | $1,644 37,515 kWh |
$775 18 kW-months/year |
$2,700 164,140 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |