IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 2426 Hardwood Dimension & Flooring Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0655 # 01 Y:2023 01 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $50,347 $17,230 Not Implemented
WV0655 # 11 Y:2023 11 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $324 $359 Implemented
WV0655 # 10 Y:2023 10 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,641 $210 Implemented
WV0655 # 09 Y:2023 09 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,005 $7,828 Implemented
WV0655 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $4,078 $12,517 Implemented
WV0655 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $6,154 $4,905 Not Implemented
WV0655 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $8,192 $5,240 Implemented
WV0655 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,873 $10,662 Not Implemented
WV0655 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $11,948 $11,050 Not Implemented
WV0655 # 03 Y:2023 03 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,350 $1,500 Implemented
WV0655 # 02 Y:2023 02 2023 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $39,676 $165,000 Not Implemented
WV0112 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,723 $17,067 Not Implemented
WV0112 # 10 Y:1997 10 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $271,330 $4,000 Not Implemented
WV0112 # 09 Y:1997 09 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $39,600 $0 Not Implemented
WV0112 # 08 Y:1997 08 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $33,194 $100 Not Implemented
WV0112 # 07 Y:1997 07 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,218 $1,680 Not Implemented
WV0112 # 06 Y:1997 06 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,621 $485 Not Implemented
WV0112 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $958 $12 Not Implemented
WV0112 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,850 $35,000 Not Implemented
WV0112 # 03 Y:1997 03 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $2,378 $0 Not Implemented
WV0112 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,750 $485 Not Implemented