IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0515 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,242 $7,928 Implemented
AS0515 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,832 $3,388 Implemented
AS0515 # 06 Y:2022 06 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $27,420 $500 Implemented
AS0515 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $6,571 $72,520 Implemented
AS0515 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,528 $28,033 Implemented
AS0515 # 01 Y:2022 01 2022 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $125,792 $20,098 Implemented
AS0344 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68 $167 Implemented
AS0344 # 05 Y:2003 05 2003 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $82 $356 Implemented
AS0344 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $473 $21 Implemented
AS0344 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,587 $10,835 Implemented
AS0344 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,169 $6,136 Implemented
AS0309 # 08 Y:2001 08 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,773 $685 Implemented
AS0309 # 02 Y:2001 02 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $426 $480 Implemented
AS0309 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,341 $3,800 Implemented
AS0309 # 07 Y:2001 07 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,413 $60 Implemented
AS0309 # 06 Y:2001 06 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $585 $1,400 Implemented
AS0309 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $962 $4,006 Implemented
AS0309 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $305 $60 Implemented
AS0284 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,064 $2,486 Implemented
AS0284 # 09 Y:2000 09 2000 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $14,280 $2,240 Implemented
AS0284 # 07 Y:2000 07 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $315 $60 Implemented
AS0284 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $852 $60 Implemented
AS0284 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $809 $100 Implemented
AS0154 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $388 $0 Implemented
AS0154 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,282 $9,274 Implemented