IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0544 # 09 Y:1998 09 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $922 $700 Implemented
WV0083 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $438 $420 Implemented
WV0083 # 07 Y:1996 07 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,047 $5,400 Not Implemented
WV0083 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,962 $2,884 Implemented
WV0083 # 05 Y:1996 05 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $847 $2,000 Not Implemented
WV0083 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,316 $300 Implemented
WV0083 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $530 $200 Not Implemented
WV0083 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,916 $7,418 Implemented
UD0380 # 04 Y:1992 04 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,539 $0 Not Implemented
UD0380 # 01 Y:1992 01 1992 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $37,776 $0 Not Implemented
UD0380 # 02 Y:1992 02 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,532 $3,452 Implemented
UD0380 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,531 $0 Implemented
UD0278 # 02 Y:1989 02 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,631 $1,000 Not Implemented
UD0278 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $839 $450 Implemented
UD0278 # 04 Y:1989 04 1989 OPTIMIZE PLANT POWER FACTOR $2,600 $10,000 Not Implemented
UD0278 # 01 Y:1989 01 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,746 $1,000 Not Implemented
UD0257 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,175 $2,800 Implemented
UD0257 # 05 Y:1988 05 1988 RECOVER WASTE HEAT FROM EQUIPMENT $20,153 $80,000 Not Implemented
UD0257 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $4,290 $7,000 Not Implemented
UD0257 # 03 Y:1988 03 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $768 $1,000 Implemented
UD0257 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $621 $3,000 Not Implemented
UD0134 # 05 Y:1984 05 1984 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $230 $0 Not Implemented
UD0134 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,118 $3,218 Not Implemented
UD0134 # 03 Y:1984 03 1984 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $4,339 $10,000 Implemented
UD0134 # 02 Y:1984 02 1984 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,306 $0 Implemented