IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

494

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0505 # 01 Y:2006 01 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $18,900 $0 Implemented
OR0505 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,600 $0 Implemented
OR0505 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,000 $0 Not Implemented
OR0505 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,300 $600 Not Implemented
OR0505 # 05 Y:2006 05 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,760 $2,700 Not Implemented
OR0505 # 06 Y:2006 06 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,000 $8,000 Not Implemented
OR0505 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,000 $1,000 Not Implemented
OR0505 # 08 Y:2006 08 2006 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $168,270 $185,000 Implemented
OR0505 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,100 $32,300 Not Implemented
OR0489 # 01 Y:2005 01 2005 UPGRADE CONTROLS ON COMPRESSORS $19,500 $5,400 Not Implemented
OR0489 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,600 $340 Implemented
OR0489 # 03 Y:2005 03 2005 PURCHASE EQUIPMENT INSTEAD OF LEASING $80,000 $58,000 Not Implemented
OR0489 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $2,330 $100 Implemented
OR0489 # 05 Y:2005 05 2005 ADJUST VENTS TO MINIMIZE ENERGY USE $24,900 $12 Implemented
OR0489 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,100 $15,400 Not Implemented
OR0489 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,800 $2,100 Implemented
OR0489 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $1,450 $3,590 Implemented
OR0489 # 09 Y:2005 09 2005 OPTIMIZE PLANT POWER FACTOR $2,090 $5,200 Not Implemented
OR0489 # 10 Y:2005 10 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $5,800 $12,000 Implemented
OR0489 # 11 Y:2005 11 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $8,500 $22,000 Not Implemented
OR0468 # 01 Y:2004 01 2004 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $19,500 $235 Not Implemented
OR0468 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,200 $9,200 Implemented
OR0468 # 03 Y:2004 03 2004 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $3,000 $0 Implemented
OR0468 # 04 Y:2004 04 2004 UPGRADE CONTROLS ON COMPRESSORS $22,000 $1,200 Implemented
OR0468 # 05 Y:2004 05 2004 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $72,800 $13,600 Not Implemented