Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,511
matching recommendationsSIC | 243 | Millwork, Plywood & Structural |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0069 # 07 Y:1989 | 07 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $108 | $200 | Implemented |
OR0069 # 08 Y:1989 | 08 | 1989 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,105 | $55,093 | Implemented |
WI0057 # 01 Y:1989 | 01 | 1989 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,033 | $0 | Not Implemented |
WI0057 # 02 Y:1989 | 02 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $8,220 | $1,750 | Implemented |
WI0057 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,593 | $21,311 | Not Implemented |
WI0057 # 04 Y:1989 | 04 | 1989 | IMPROVE LUBRICATION PRACTICES | $2,088 | $0 | Not Implemented |
WI0057 # 05 Y:1989 | 05 | 1989 | INSTALL AUTOMATIC STACK DAMPER | $1,970 | $1,400 | Implemented |
WI0057 # 06 Y:1989 | 06 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $507 | $500 | Not Implemented |
WI0057 # 07 Y:1989 | 07 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $271 | $0 | Not Implemented |
WI0057 # 08 Y:1989 | 08 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $211 | $0 | Not Implemented |
OR0042 # 01 Y:1988 | 01 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,776 | $0 | Implemented |
OR0042 # 02 Y:1988 | 02 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,164 | $5,000 | Implemented |
OR0042 # 03 Y:1988 | 03 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,349 | $500 | Not Implemented |
OR0042 # 04 Y:1988 | 04 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,087 | $623 | Implemented |
OR0042 # 05 Y:1988 | 05 | 1988 | OPTIMIZE PLANT POWER FACTOR | $2,293 | $4,800 | Implemented |
OR0042 # 06 Y:1988 | 06 | 1988 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $36,759 | $0 | Not Implemented |
UD0278 # 01 Y:1989 | 01 | 1989 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,746 | $1,000 | Not Implemented |
UD0278 # 02 Y:1989 | 02 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,631 | $1,000 | Not Implemented |
UD0278 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $839 | $450 | Implemented |
UD0278 # 04 Y:1989 | 04 | 1989 | OPTIMIZE PLANT POWER FACTOR | $2,600 | $10,000 | Not Implemented |
OR0032 # 01 Y:1988 | 01 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,763 | $0 | Implemented |
OR0032 # 02 Y:1988 | 02 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,787 | $0 | Implemented |
OR0032 # 03 Y:1988 | 03 | 1988 | INSULATE BARE EQUIPMENT | $1,339 | $629 | Implemented |
OR0032 # 04 Y:1988 | 04 | 1988 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,022 | $5,200 | Implemented |
OR0032 # 05 Y:1988 | 05 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $344 | $280 | Implemented |