Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1989 |
Principal Product | PLYWOOD |
NAICS | n/a |
SIC | 2435 - Hardwood Veneer And Plywood |
Sales | $1,000,000-$5,000,000 |
# of Employees | 375 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 120 Thousand Feet |
Production Hrs. Annual | 6,916 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $528,822 | 19,317,996 | kWh | $0.03 |
Wood | $786,880 | 1,205,023 | MMBtu | $0.65 |
TOTAL ENERGY COSTS | $1,315,702 | |||
RECOMMENDED SAVINGS* | $324,177 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,686 |
#|Description |
Savings Cost |
Status | Electricity Usage | Wood | Administrative Changes | Electricity Usage | Wood | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $9,642 Cost: - |
- | - | $9,642 | 14,756 | - | - |
- - kWh |
$9,642 14,756 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $5,010 Cost: - |
$3,383 | 172,626 | - | - | $1,627 | - |
$3,383 172,626 kWh |
- - MMBtu |
$1,627 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $2,409 Cost: - |
$2,409 | 123,095 | - | - | - | - |
$2,409 123,095 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $17,258 Cost: $370 |
$17,258 | - | - | - | - | - |
$17,258 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,867 Cost: $2,499 |
$1,431 | 53,048 | - | - | $8,436 | - |
$1,431 53,048 kWh |
- - MMBtu |
$8,436 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,848 Cost: $500 |
$1,848 | 68,581 | - | - | - | - |
$1,848 68,581 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $4,272 Cost: $2,814 |
- | - | $4,272 | 6,538 | - | - |
- - kWh |
$4,272 6,538 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $704 Cost: $576 |
$704 | 26,084 | - | - | - | - |
$704 26,084 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,552 Cost: $3,000 |
$2,552 | 94,666 | - | - | - | - |
$2,552 94,666 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $2,056 Cost: $3,300 |
$2,056 | - | - | - | - | - |
$2,056 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.7214 REDUCE OR ELIMINATE WASTE |
Savings: $268,559 Cost: $1,000,000 |
$(-31,097) | (-916,471) | $10,741 | 16,449 | $288,915 | - |
$(-31,097) (-916,471) kWh |
$10,741 16,449 MMBtu |
$288,915 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $324,177 Cost: $1,013,059 |
$544 | (-378,371) | $24,655 | 37,743 | $298,978 | - | $544 (-378,371) kWh |
$24,655 37,743 MMBtu |
$298,978 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,686 Cost: $5,999 |
$11,623 | 512,016 | - | - | $10,063 | - | $11,623 512,016 kWh |
- - MMBtu |
$10,063 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||