IAC Assessment: OR0068
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product PLYWOOD
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $1,000,000-$5,000,000
# of Employees 375
Plant Area (Sq.Ft.) 0
Annual Production 120 Thousand Feet
Production Hrs. Annual 6,916
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $528,822 19,317,996 kWh $0.03
Wood $786,880 1,205,023 MMBtu $0.65
TOTAL ENERGY COSTS $1,315,702
RECOMMENDED SAVINGS* $324,177 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,686
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,642
Cost:
-
- - $9,642 14,756 - - -
-
kWh
$9,642
14,756
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$5,010
Cost:
-
$3,383 172,626 - - $1,627 - $3,383
172,626
kWh
-
-
MMBtu
$1,627
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,409
Cost:
-
$2,409 123,095 - - - - $2,409
123,095
kWh
-
-
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$17,258
Cost:
$370
$17,258 - - - - - $17,258
-
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,867
Cost:
$2,499
$1,431 53,048 - - $8,436 - $1,431
53,048
kWh
-
-
MMBtu
$8,436
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,848
Cost:
$500
$1,848 68,581 - - - - $1,848
68,581
kWh
-
-
MMBtu
-
-
$
07: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$4,272
Cost:
$2,814
- - $4,272 6,538 - - -
-
kWh
$4,272
6,538
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$704
Cost:
$576
$704 26,084 - - - - $704
26,084
kWh
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,552
Cost:
$3,000
$2,552 94,666 - - - - $2,552
94,666
kWh
-
-
MMBtu
-
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,056
Cost:
$3,300
$2,056 - - - - - $2,056
-
kWh
-
-
MMBtu
-
-
$
11: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$268,559
Cost:
$1,000,000
$(-31,097) (-916,471) $10,741 16,449 $288,915 - $(-31,097)
(-916,471)
kWh
$10,741
16,449
MMBtu
$288,915
-
$
TOTAL RECOMMENDED Savings:
$324,177
Cost:
$1,013,059
$544 (-378,371) $24,655 37,743 $298,978 - $544
(-378,371)
kWh
$24,655
37,743
MMBtu
$298,978
-
$
TOTAL IMPLEMENTED Savings:
$21,686
Cost:
$5,999
$11,623 512,016 - - $10,063 - $11,623
512,016
kWh
-
-
MMBtu
$10,063
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes