IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0254 # 08 Y:1995 08 1995 USE PHOTOCELL CONTROLS $130 $40 Implemented
AM0254 # 07 Y:1995 07 1995 USE SYNTHETIC LUBRICANT $220 $0 Not Implemented
AM0254 # 06 Y:1995 06 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $590 $1,180 Not Implemented
AM0254 # 05 Y:1995 05 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $720 $0 Not Implemented
AM0254 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $860 $72 Not Implemented
AM0254 # 03 Y:1995 03 1995 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,600 $0 Not Implemented
AM0254 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,840 $0 Implemented
AM0254 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,390 $2,000 Implemented
DS0041 # 04 Y:1995 04 1995 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $4,446 $-1,324 Implemented
DS0041 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $762 $1,947 Implemented
DS0041 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $911 $3,007 Implemented
DS0041 # 03 Y:1995 03 1995 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $52,648 $95,000 Implemented
OR0253 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,142 $0 Not Implemented
OR0253 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,570 $35,000 Not Implemented
OR0253 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,009 $2,543 Not Implemented
OR0253 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $29,097 $26,200 Not Implemented
OR0253 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,790 $5,000 Not Implemented
UF0126 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,672 $9,944 Not Implemented
UF0126 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,683 $18,125 Not Implemented
UF0126 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,132 $2,000 Implemented
UF0126 # 06 Y:1995 06 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,503,626 $4,550,000 Not Implemented
UF0126 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $46,162 $114,584 Implemented
UF0126 # 08 Y:1995 08 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $86,181 $84,000 Not Implemented
UF0126 # 07 Y:1995 07 1995 USE POWER DURING OFF-PEAK PERIODS $72,554 $0 Not Implemented
UF0126 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,087 $149,527 Not Implemented