Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 243 | Millwork, Plywood & Structural |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0033 # 08 Y:2002 | 08 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,557 | $235 | Implemented |
UU0033 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,422 | $116 | Implemented |
UU0033 # 06 Y:2002 | 06 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,481 | $1,158 | Not Implemented |
UU0033 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,217 | $11,405 | Not Implemented |
UU0033 # 01 Y:2002 | 01 | 2002 | OPTIMIZE PLANT POWER FACTOR | $4,720 | $4,461 | Implemented |
UU0033 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $688 | $1,688 | Implemented |
UU0033 # 03 Y:2002 | 03 | 2002 | USE SYNTHETIC LUBRICANT | $2,551 | $1,000 | Implemented |
UU0033 # 04 Y:2002 | 04 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,484 | $0 | Implemented |
IA0300 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,790 | $616 | Implemented |
IA0300 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $834 | $1,264 | Not Implemented |
IA0300 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,588 | $316 | Implemented |
IA0300 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,088 | $381 | Implemented |
IA0300 # 07 Y:2002 | 07 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,830 | $960 | Implemented |
IA0300 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $762 | $3,567 | Not Implemented |
IA0300 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,935 | $279 | Not Implemented |
OR0412 # 02 Y:2002 | 02 | 2002 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,100 | $31,375 | Implemented |
OR0412 # 04 Y:2002 | 04 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $35,400 | $2,900 | Not Implemented |
OR0412 # 03 Y:2002 | 03 | 2002 | SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE | $16,900 | $33,800 | Not Implemented |
OR0412 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,306 | $4,970 | Implemented |
OR0412 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,825 | $8,000 | Implemented |
OR0412 # 01 Y:2002 | 01 | 2002 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $23,700 | $62,500 | Implemented |
AS0323 # 05 Y:2002 | 05 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $633 | $0 | Implemented |
AS0323 # 07 Y:2002 | 07 | 2002 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $1,800 | $154 | Implemented |
AS0323 # 08 Y:2002 | 08 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $29,052 | $6,600 | Implemented |
AS0323 # 09 Y:2002 | 09 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $109,188 | $7,050 | Implemented |