IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0309 # 08 Y:2001 08 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,773 $685 Implemented
AS0309 # 07 Y:2001 07 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,413 $60 Implemented
AS0309 # 06 Y:2001 06 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $585 $1,400 Implemented
AS0309 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $962 $4,006 Implemented
AS0309 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $305 $60 Implemented
AS0309 # 02 Y:2001 02 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $426 $480 Implemented
AS0309 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,341 $3,800 Implemented
AS0284 # 09 Y:2000 09 2000 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $14,280 $2,240 Implemented
AS0284 # 07 Y:2000 07 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $315 $60 Implemented
AS0284 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $852 $60 Implemented
AS0284 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $809 $100 Implemented
AS0284 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,064 $2,486 Implemented
AS0129 # 06 Y:1994 06 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,761 $2,500 Implemented
AS0129 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $700 Implemented
AS0129 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,468 $0 Implemented
AS0129 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,771 $7,024 Implemented
AS0092 # 08 Y:1993 08 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $618 $1,000 Implemented
AS0092 # 07 Y:1993 07 1993 USE SYNTHETIC LUBRICANT $518 $926 Implemented
AS0092 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $316 $0 Implemented
AS0092 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228 $742 Implemented
AS0027 # 01 Y:1991 01 1991 REDUCE VENTILATION AIR $4,948 $0 Implemented
AS0027 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,912 $1,500 Implemented
AS0027 # 04 Y:1991 04 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $895 $1,200 Implemented
AS0027 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $3,312 Implemented
AS0027 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $141 Implemented