IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,179

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0482 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,756 $55,500 Not Implemented
WI0482 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,773 $50,985 Not Implemented
WI0482 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,362 $3,571 Implemented
WI0482 # 04 Y:2005 04 2005 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $6,615 $13,500 Not Implemented
WI0482 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,791 $640 Not Implemented
WI0482 # 06 Y:2005 06 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,495 $500 Implemented
WI0482 # 07 Y:2005 07 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $697 $1,000 Not Implemented
WI0482 # 08 Y:2005 08 2005 USE PHOTOCELL CONTROLS $617 $2,200 Not Implemented
OR0469 # 01 Y:2004 01 2004 UPGRADE CONTROLS ON COMPRESSORS $7,100 $2,000 Not Implemented
OR0469 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,200 $0 Not Implemented
OR0469 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,830 $885 Not Implemented
OR0469 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,500 $4,500 Not Implemented
OR0469 # 05 Y:2004 05 2004 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,600 $2,300 Not Implemented
OR0469 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,000 $14,620 Not Implemented
OR0469 # 07 Y:2004 07 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,770 $31,500 Not Implemented
OR0469 # 08 Y:2004 08 2004 OPTIMIZE PLANT POWER FACTOR $4,610 $14,750 Not Implemented
NC0279 # 01 Y:2004 01 2004 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $3,220 $20,000 Implemented
NC0279 # 02 Y:2004 02 2004 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $25,415 $25,000 Not Implemented
NC0279 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,096 $1,875 Implemented
NC0279 # 04 Y:2004 04 2004 $59,248 $6,000 Implemented
NC0279 # 05 Y:2004 05 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,880 $9,200 Not Implemented
NC0279 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $120 Not Implemented
NC0279 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $253 $775 Not Implemented
NC0279 # 08 Y:2004 08 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $68 $80 Not Implemented
OR0446 # 01 Y:2003 01 2003 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $508,000 $28,000 Not Implemented