IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0046 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,696 $2,900 Implemented
TT0046 # 02 Y:2010 02 2010 OPTIMIZE PLANT POWER FACTOR $9,000 $15,300 Not Implemented
TT0046 # 01 Y:2010 01 2010 REDUCE VENTILATION AIR $42,784 $0 Not Implemented
TT0011 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $133 $60 Implemented
TT0011 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,054 $559,252 Not Implemented
TT0011 # 01 Y:2007 01 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,000 $5,000 Implemented
TN0556 # 06 Y:1995 06 1995 MODIFY MATERIAL APPLICATION METHODS $205,755 $81,770 Implemented
TN0556 # 05 Y:1995 05 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,298 $0 Not Implemented
TN0556 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $374 $38 Implemented
TN0556 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $660 $1,240 Not Implemented
TN0556 # 02 Y:1995 02 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $4,587 $18,500 Not Implemented
TN0556 # 01 Y:1995 01 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,874 $7,950 Not Implemented
TN0532 # 10 Y:1994 10 1994 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,933 $8,480 Not Implemented
TN0532 # 09 Y:1994 09 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,860 $0 Not Implemented
TN0532 # 08 Y:1994 08 1994 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $14,584 $13,200 Not Implemented
TN0532 # 07 Y:1994 07 1994 USE LESS WASTEFUL PACKAGING $35,354 $65,000 Not Implemented
TN0532 # 06 Y:1994 06 1994 MAKE A NEW BY-PRODUCT $118,866 $206,400 Implemented
TN0532 # 05 Y:1994 05 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $261 $0 Implemented
TN0532 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $624 $440 Not Implemented
TN0532 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $952 $300 Not Implemented
TN0532 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,314 $490 Implemented
TN0532 # 01 Y:1994 01 1994 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,297 $17,400 Not Implemented
TN0182 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $2,850 Not Implemented
TN0182 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140 $322 Not Implemented
TN0182 # 02 Y:1983 02 1983 AIR CONDITION ONLY SPACE NECESSARY $500 $1,000 Not Implemented