Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
443
matching recommendationsSIC | 2434 | Wood Kitchen Cabinets |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0926 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $190,860 | $18,580 | n/a |
AM0926 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,460 | $33 | n/a |
AM0926 # 04 Y:2024 | 04 | 2024 | USE PHOTOCELL CONTROLS | $410 | $60 | n/a |
AM0926 # 05 Y:2024 | 05 | 2024 | USE SYNTHETIC LUBRICANT | $410 | $10 | n/a |
AM0926 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $190 | $250 | n/a |
AM0926 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $22,740 | $22,490 | n/a |
WV0665 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $2,096 | $1,417 | n/a |
WV0665 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $7,375 | $13,475 | n/a |
WV0665 # 04 Y:2024 | 04 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $7,315 | $22,800 | n/a |
WV0665 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $3,763 | $2,971 | n/a |
WV0665 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,272 | $1,500 | n/a |
WV0665 # 11 Y:2024 | 11 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,829 | $9,140 | n/a |
WV0665 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,926 | $238,677 | n/a |
WV0665 # 08 Y:2024 | 08 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,306 | $1,070 | n/a |
WV0665 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $100,715 | $390,000 | n/a |
WV0665 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,064 | $3,296 | n/a |
WV0665 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,835 | $150 | n/a |
WV0665 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,582 | $375 | n/a |
SF0615 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $941 | $1,884 | n/a |
SF0615 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,843 | $2,120 | n/a |
SF0615 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,315 | $55,046 | n/a |
SF0615 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,570 | $0 | n/a |
UW2312 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,841 | $1,520 | Not Implemented |
UW2312 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $236,659 | $2,614,888 | Not Implemented |
UW2312 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,943 | $30,989 | Not Implemented |