Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 2434 | Wood Kitchen Cabinets |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0644 # 11 Y:2023 | 11 | 2023 | INSULATE BARE EQUIPMENT | $21 | $31 | Implemented |
WV0644 # 10 Y:2023 | 10 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $76 | $368 | Implemented |
WV0644 # 09 Y:2023 | 09 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $310 | $592 | Implemented |
WV0644 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $459 | $1,293 | Implemented |
WV0644 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $523 | $1,573 | Implemented |
WV0644 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $530 | $100 | Implemented |
WV0644 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $954 | $1,965 | Implemented |
WV0644 # 04 Y:2023 | 04 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $4,007 | $10,420 | Not Implemented |
WV0644 # 03 Y:2023 | 03 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,500 | $1,023 | Implemented |
WV0644 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,092 | $29,560 | Not Implemented |
WV0644 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $23,558 | $12,360 | Not Implemented |
WV0303 # 13 Y:2004 | 13 | 2004 | INSULATE BARE EQUIPMENT | $171 | $303 | Implemented |
WV0303 # 14 Y:2004 | 14 | 2004 | RECOVER AND REUSE WASTE MATERIAL | $24,000 | $458 | Not Implemented |
WV0303 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,432 | $0 | Not Implemented |
WV0303 # 12 Y:2004 | 12 | 2004 | INSTALL OCCUPANCY SENSORS | $606 | $2,422 | Not Implemented |
WV0303 # 11 Y:2004 | 11 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $816 | $515 | Implemented |
WV0303 # 10 Y:2004 | 10 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,061 | $414 | Implemented |
WV0303 # 09 Y:2004 | 09 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,586 | $2,606 | Not Implemented |
WV0303 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,770 | $236 | Implemented |
WV0303 # 07 Y:2004 | 07 | 2004 | USE SYNTHETIC LUBRICANT | $1,981 | $560 | Implemented |
WV0303 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,414 | $618 | Implemented |
WV0303 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,576 | $8,537 | Implemented |
WV0303 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,262 | $137 | Not Implemented |
WV0303 # 03 Y:2004 | 03 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,999 | $3,622 | Not Implemented |
WV0303 # 02 Y:2004 | 02 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $8,151 | $458 | Implemented |