Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
374
matching recommendationsSIC | 2435 | Hardwood Veneer And Plywood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0701 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,441 | $4,175 | Not Implemented |
OR0701 # 03 Y:2018 | 03 | 2018 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,954 | $11,773 | Not Implemented |
OR0701 # 01 Y:2018 | 01 | 2018 | INSTALL SYSTEM TO COLLECT SCRAP | $35,903 | $29,900 | Not Implemented |
OR0701 # 02 Y:2018 | 02 | 2018 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $17,929 | $8,549 | Not Implemented |
NC0610 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,172 | $200 | Implemented |
NC0610 # 06 Y:2018 | 06 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,484 | $10,000 | Implemented |
NC0610 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,006 | $1,350 | Not Implemented |
NC0610 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,309 | $135,942 | Implemented |
NC0610 # 05 Y:2018 | 05 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,293 | $10,000 | Implemented |
NC0610 # 07 Y:2018 | 07 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,934 | $5,865 | Implemented |
NC0610 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $981 | $100 | Not Implemented |
BS0091 # 04 Y:2017 | 04 | 2017 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $24,685 | $3,100 | Not Implemented |
BS0091 # 03 Y:2017 | 03 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,201 | $240 | Not Implemented |
BS0091 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,806 | $39,830 | Not Implemented |
BS0091 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,778 | $17,240 | Not Implemented |
BS0088 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,994 | $29,692 | Not Implemented |
BS0088 # 02 Y:2016 | 02 | 2016 | LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | $64,374 | $480 | Not Implemented |
BS0088 # 01 Y:2016 | 01 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,541 | $11,782 | Not Implemented |
UA0156 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $28,560 | $700 | Implemented |
UA0156 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $78,495 | $82,466 | Implemented |
UA0156 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $27,817 | $1,000 | Not Implemented |
UA0156 # 01 Y:2016 | 01 | 2016 | INSULATE FEEDWATER TANK | $34,968 | $50,000 | Implemented |
UA0156 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,024 | $6,995 | Not Implemented |
UA0150 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,421 | $49,673 | Not Implemented |
UA0150 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,229 | $2,995 | Implemented |