Assessment Year 2018
Principal Product veneer/hydromulch
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 100,000
Annual Production 600,000 Units
Production Hrs. Annual 5,200
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $359,763 8,373,600 kWh $0.04
Electricity Demand $186,739 23,608 kW-months/year $7.91
Electricity Fees $630 - $ -
Natural Gas $108,991 33,932 MMBtu $3.21
Wood $190,789 27,720 MMBtu $6.88
TOTAL ENERGY COSTS $846,912
RECOMMENDED SAVINGS* $67,227 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$35,903
Cost:
$29,900
- - - - $35,903 - - - - - -
-
kWh
-
-
kW-months/year
$35,903
-
$
-
-
$
-
-
$
02: 2.2128 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) Savings:
$17,929
Cost:
$8,549
- - - - - - $17,929 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$17,929
-
$
-
-
$
03: 2.4131 REPLACE OVER-SIZE MOTORS AND PUMPS WITH OPTIMUM SIZE Savings:
$11,954
Cost:
$11,773
$10,174 211,958 $1,780 225 - - - - - - $10,174
211,958
kWh
$1,780
225
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,441
Cost:
$4,175
$1,010 21,045 $234 30 $238 - - - $(-41) - $1,010
21,045
kWh
$234
30
kW-months/year
$238
-
$
-
-
$
$(-41)
-
$
TOTAL RECOMMENDED Savings:
$67,227
Cost:
$54,397
$11,184 233,003 $2,014 255 $36,141 - $17,929 - $(-41) - $11,184
233,003
kWh
$2,014
255
kW-months/year
$36,141
-
$
$17,929
-
$
$(-41)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost