IAC logo
IAC Assessment: OR0701
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0701
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2018
Principal Product veneer/hydromulch
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 100,000
Annual Production 600,000 Units
Production Hrs. Annual 5,200
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $359,763 8,373,600 kWh $0.04
Electricity Demand $186,739 23,608 kW-months/year $7.91
Electricity Fees $630 - $ -
Natural Gas $108,991 33,932 MMBtu $3.21
Wood $190,789 27,720 MMBtu $6.88
TOTAL ENERGY COSTS $846,912
RECOMMENDED SAVINGS* $67,227 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$35,903
Cost:
$29,900
- - - - $35,903 - - - - - -
-
kWh
-
-
kW-months/year
$35,903
-
$
-
-
$
-
-
$
02: 2.2128 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) Savings:
$17,929
Cost:
$8,549
- - - - - - $17,929 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$17,929
-
$
-
-
$
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$11,954
Cost:
$11,773
$10,174 211,958 $1,780 225 - - - - - - $10,174
211,958
kWh
$1,780
225
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,441
Cost:
$4,175
$1,010 21,045 $234 30 $238 - - - $(-41) - $1,010
21,045
kWh
$234
30
kW-months/year
$238
-
$
-
-
$
$(-41)
-
$
TOTAL RECOMMENDED Savings:
$67,227
Cost:
$54,397
$11,184 233,003 $2,014 255 $36,141 - $17,929 - $(-41) - $11,184
233,003
kWh
$2,014
255
kW-months/year
$36,141
-
$
$17,929
-
$
$(-41)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost