IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 2435 Hardwood Veneer And Plywood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0165 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,026 $2,400 Implemented
OD0165 # 05 Y:2000 05 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $31,722 $0 Implemented
OD0165 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $1,285 $760 Not Implemented
OD0165 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,019 $400 Not Implemented
OD0165 # 02 Y:2000 02 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $2,597 $560 Implemented
OD0165 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,895 $103,963 Not Implemented
NC0131 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,652 $0 Implemented
NC0131 # 07 Y:1998 07 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $7,350 $0 Not Implemented
NC0131 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $810 $2,000 Not Implemented
NC0131 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,092 $5,200 Not Implemented
NC0131 # 04 Y:1998 04 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $846 $0 Implemented
NC0131 # 03 Y:1998 03 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,043 $0 Not Implemented
NC0131 # 02 Y:1998 02 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,446 $9,100 Not Implemented
OD0062 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,718 $2,400 Not Implemented
OD0062 # 04 Y:1996 04 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,171 $780 Implemented
OD0062 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,512 $8,748 Implemented
OD0062 # 06 Y:1996 06 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $25,196 $0 Not Implemented
OD0062 # 02 Y:1996 02 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,584 $3,850 Not Implemented
OD0062 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,072 $2,400 Implemented
OD0029 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,168 $5,356 Not Implemented
OD0029 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,463 $800 Implemented
OD0029 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,457 $1,773 Not Implemented
OD0029 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,739 $1,895 Not Implemented
OD0029 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $582 $360 Implemented
OD0029 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,341 $5,389 Not Implemented