IAC logo
IAC Assessment: NC0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1998
Principal Product laminated furniture components
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $5,000,000-$10,000,000
# of Employees 140
Plant Area (Sq.Ft.) 150,000
Annual Production 2,500,000 Thousand Feet
Production Hrs. Annual 2,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,918 2,295,135 kWh $0.02
Electricity Demand $77,148 8,727 kW-months/year $8.84
Electricity Fees $766 - $ -
Coal $5,000 2,069 MMBtu $2.42
TOTAL ENERGY COSTS $138,127
RECOMMENDED SAVINGS* $24,239 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,498
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Coal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Coal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,652
Cost:
-
- - $2,652 300 - - - - - - - - - - - - - - -
-
kWh
$2,652
300
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,446
Cost:
$9,100
$3,819 182,005 $2,775 295 - - $(-2,148) (-900) - - - - - - - - - - $3,819
182,005
kWh
$2,775
295
kW-months/year
-
-
$
$(-2,148)
(-900)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$7,043
Cost:
-
- - $47,912 - $(-40,869) - - - - - - - - - - - - - -
-
kWh
$47,912
-
kW-months/year
$(-40,869)
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$846
Cost:
-
- - - - - - $846 350 - 50,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$846
350
MMBtu
-
50,000
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,092
Cost:
$5,200
- - - - - - - - $1,112 57,000 - - $480 - - - $(-500) - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,112
57,000
lb
-
-
$
$480
-
$
-
-
$
$(-500)
-
$
06: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$810
Cost:
$2,000
- - - - - - - - - - $810 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$810
-
$
-
-
$
-
-
$
-
-
$
07: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$7,350
Cost:
-
$(-277) (-13,189) $(-573) 61 - - - - $200 200,000 - - - - $8,000 - - - $(-277)
(-13,189)
kWh
$(-573)
61
kW-months/year
-
-
$
-
-
MMBtu
$200
200,000
lb
-
-
$
-
-
$
$8,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$24,239
Cost:
$16,300
$3,542 168,816 $52,766 656 $(-40,869) - $(-1,302) (-550) $1,312 307,000 $810 - $480 - $8,000 - $(-500) - $3,542
168,816
kWh
$52,766
656
kW-months/year
$(-40,869)
-
$
$(-1,302)
(-550)
MMBtu
$1,312
307,000
lb
$810
-
$
$480
-
$
$8,000
-
$
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
$3,498
Cost:
-
- - $2,652 300 - - $846 350 - 50,000 - - - - - - - - -
-
kWh
$2,652
300
kW-months/year
-
-
$
$846
350
MMBtu
-
50,000
lb
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Coal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Coal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost