Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 2439 | Structural Wood Members, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0657 # 05 Y:2012 | 05 | 2012 | USE SOLAR HEAT TO MAKE ELECTRICTY | $2,460 | $35,000 | Not Implemented |
CO0657 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $460 | $510 | Not Implemented |
CO0657 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $460 | $0 | Implemented |
CO0657 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,840 | $350 | Implemented |
CO0657 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,210 | $77,390 | Not Implemented |
CO0576 # 02 Y:2005 | 02 | 2005 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $4,450 | $0 | Not Implemented |
CO0576 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $920 | $1,440 | Not Implemented |
CO0576 # 07 Y:2005 | 07 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,740 | $980 | Not Implemented |
CO0576 # 06 Y:2005 | 06 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,670 | $9,240 | Not Implemented |
CO0576 # 05 Y:2005 | 05 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,190 | $17,170 | Not Implemented |
CO0576 # 04 Y:2005 | 04 | 2005 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $200 | $170 | Implemented |
CO0576 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,540 | $190 | Implemented |
CO0576 # 01 Y:2005 | 01 | 2005 | INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES | $84,000 | $30,670 | Not Implemented |
CO0468 # 01 Y:2000 | 01 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,550 | $1,610 | Implemented |
CO0468 # 10 Y:2000 | 10 | 2000 | MODIFY STARTUP/SHUTDOWN TIMES | $3,310 | $1,770 | Implemented |
CO0468 # 09 Y:2000 | 09 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $5,620 | $100 | Implemented |
CO0468 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $58,970 | $60,000 | Implemented |
CO0468 # 07 Y:2000 | 07 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $200 | $0 | Implemented |
CO0468 # 06 Y:2000 | 06 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,770 | $0 | Implemented |
CO0468 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $0 | Implemented |
CO0468 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $240 | $40 | Not Implemented |
CO0468 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $570 | $310 | Implemented |
CO0468 # 02 Y:2000 | 02 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,170 | $1,200 | Not Implemented |