IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
Reset
SIC 2439 Structural Wood Members, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0639 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $14,677 $12,315 Implemented
OR0639 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,461 $360 Implemented
OR0639 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $7,377 $7,643 Implemented
OR0554 # 01 Y:2010 01 2010 $33,705 $0 Implemented
OR0554 # 03 Y:2010 03 2010 UPGRADE CONTROLS ON COMPRESSORS $13,900 $1,500 Implemented
OR0554 # 04 Y:2010 04 2010 REDUCE FLUID FLOW RATES $6,442 $6,442 Implemented
OR0516 # 02 Y:2007 02 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,100 $37,100 Implemented
OR0516 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,600 $15,300 Implemented
OR0516 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $5,300 $7,800 Implemented
OR0516 # 05 Y:2007 05 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,400 $9,800 Implemented
OR0096 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,821 $5,000 Implemented
OR0096 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $4,273 $2,500 Implemented
OR0096 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,092 $1,530 Implemented
OR0096 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,603 $13,000 Implemented