IAC logo
IAC Assessment: OR0639
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0639
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Engineered Wood Facility
NAICS 321213 - Engineered Wood Member (except Truss) Manufacturing
SIC 2439 - Structural Wood Members, Nec
Sales $100,000,000-$500,000,000
# of Employees 152
Plant Area (Sq.Ft.) 625,707
Annual Production 35,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $945,840 19,684,800 kWh $0.05
Electricity Demand $379,801 44,281 kW-months/year $8.58
Electricity Fees $55,815 - $ -
Natural Gas $1,439,531 296,787 MMBtu $4.85
TOTAL ENERGY COSTS $2,820,987
RECOMMENDED SAVINGS* $44,615 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,515
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$14,677
Cost:
$12,315
$414 8,357 - - - - $14,263 2,941 - - - - $414
8,357
kWh
-
-
kW-months/year
-
-
$
$14,263
2,941
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,461
Cost:
$360
$5,567 112,478 - - - - - - $1,822 - $1,072 - $5,567
112,478
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,822
-
$
$1,072
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$10,572
Cost:
$7,500
- - $10,572 1,200 - - - - - - - - -
-
kWh
$10,572
1,200
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,377
Cost:
$7,643
- - - - - - $7,377 1,521 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,377
1,521
MMBtu
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,528
Cost:
$15,201
- - - - $3,528 - - - - - - - -
-
kWh
-
-
kW-months/year
$3,528
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$44,615
Cost:
$43,019
$5,981 120,835 $10,572 1,200 $3,528 - $21,640 4,462 $1,822 - $1,072 - $5,981
120,835
kWh
$10,572
1,200
kW-months/year
$3,528
-
$
$21,640
4,462
MMBtu
$1,822
-
$
$1,072
-
$
TOTAL IMPLEMENTED Savings:
$30,515
Cost:
$20,318
$5,981 120,835 - - - - $21,640 4,462 $1,822 - $1,072 - $5,981
120,835
kWh
-
-
kW-months/year
-
-
$
$21,640
4,462
MMBtu
$1,822
-
$
$1,072
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost