IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 2439 Structural Wood Members, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0468 # 10 Y:2000 10 2000 MODIFY STARTUP/SHUTDOWN TIMES $3,310 $1,770 Implemented
CO0468 # 01 Y:2000 01 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,550 $1,610 Implemented
CO0468 # 02 Y:2000 02 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,170 $1,200 Not Implemented
CO0468 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $310 Implemented
CO0468 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $240 $40 Not Implemented
CO0468 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $0 Implemented
CO0468 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,770 $0 Implemented
CO0468 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200 $0 Implemented
CO0468 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $58,970 $60,000 Implemented
CO0468 # 09 Y:2000 09 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $5,620 $100 Implemented
NV0152 # 06 Y:2000 06 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,178 $3,500 Implemented
NV0152 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,244 $0 Implemented
NV0152 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $898 $303 Implemented
NV0152 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $532 $500 Not Implemented
NV0152 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $642 $450 Not Implemented
NV0152 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $6,243 $5,535 Not Implemented
BD0154 # 07 Y:2000 07 2000 PAY BILLS ON TIME TO AVOID LATE FEES $530 $0 Not Implemented
BD0154 # 06 Y:2000 06 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $7,201 $4,500 Not Implemented
BD0154 # 05 Y:2000 05 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $9,000 $1,000 Implemented
BD0154 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $1,042 $600 Not Implemented
BD0154 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,375 $260 Not Implemented
BD0154 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $4,094 $1,000 Implemented
BD0154 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,576 $1,000 Implemented
DS0151 # 01 Y:2000 01 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,672 $192 Implemented
DS0151 # 02 Y:2000 02 2000 ADOPT IN-HOUSE MATERIAL GENERATION $8,245 $4,500 Not Implemented