IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
Reset
SIC 244 Wood Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0220 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,400 $374 Implemented
ND0220 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,167 $400 Implemented
ND0220 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $341 $100 Implemented
ND0220 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $127 $190 Not Implemented
ND0220 # 07 Y:1995 07 1995 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $117 $70 Implemented
ND0220 # 08 Y:1995 08 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $87 $0 Implemented
UF0113 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,541 $1,000 Not Implemented
UF0113 # 02 Y:1995 02 1995 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,588 $84 Implemented
UF0113 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $972 $3,690 Implemented
UF0113 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,911 $5,465 Implemented
UF0113 # 05 Y:1995 05 1995 USE PHOTOCELL CONTROLS $895 $1,800 Implemented
UF0113 # 06 Y:1995 06 1995 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $5,568 $27,500 Not Implemented
UF0104 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,051 $1,187 Implemented
UF0104 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,614 $40,200 Not Implemented
UF0104 # 03 Y:1994 03 1994 USE PHOTOCELL CONTROLS $2,133 $5,400 Implemented
UF0104 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,332 $17,794 Implemented
UF0104 # 05 Y:1994 05 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $6,219 $5,294 Not Implemented
UF0104 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,468 $36,540 Not Implemented
AM0181 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $3,000 $6,000 Implemented
AM0181 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,210 $9,440 Implemented
AM0181 # 03 Y:1993 03 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,042 $2,250 Not Implemented
AM0181 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $820 $420 Implemented
AS0042 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,032 $500 Not Implemented
AS0042 # 02 Y:1991 02 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,446 $1,200 Not Implemented
AS0042 # 03 Y:1991 03 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $572 $0 Not Implemented