IAC Assessment: AS0042
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0042
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1991
Principal Product WOOD PALLETS
NAICS n/a
SIC 2448 - Wood Pallets And Skids
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 13,000 Thousand Feet
Production Hrs. Annual 2,210
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,485 227,726 kWh $0.10
TOTAL ENERGY COSTS $22,485
RECOMMENDED SAVINGS* $10,898 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,032
Cost:
$500
$3,032 30,774 - - $3,032
30,774
kWh
-
-
$
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$4,446
Cost:
$1,200
$4,446 45,135 - - $4,446
45,135
kWh
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$572
Cost:
-
$572 5,862 - - $572
5,862
kWh
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$296
Cost:
$965
$296 2,931 - - $296
2,931
kWh
-
-
$
05: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$706
Cost:
-
$706 7,034 - - $706
7,034
kWh
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,584
Cost:
$5,000
$1,584 - - - $1,584
-
kWh
-
-
$
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$110
Cost:
$80
$110 - - - $110
-
kWh
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$87
Cost:
-
$134 1,465 $(-47) - $134
1,465
kWh
$(-47)
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$65
Cost:
$39
$65 586 - - $65
586
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$10,898
Cost:
$7,784
$10,945 93,787 $(-47) - $10,945
93,787
kWh
$(-47)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes