Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 2448 | Wood Pallets And Skids |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0264 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,073 | $780 | Not Implemented |
IA0264 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,722 | $173 | Implemented |
IA0264 # 10 Y:2001 | 10 | 2001 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $44,460 | $8,000 | Not Implemented |
IA0264 # 09 Y:2001 | 09 | 2001 | MOVE PRODUCT USING MECHANICAL MEANS | $177,056 | $100,000 | Not Implemented |
IA0264 # 08 Y:2001 | 08 | 2001 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $303,062 | $2,050 | Not Implemented |
IA0264 # 07 Y:2001 | 07 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,091 | $0 | Implemented |
IA0264 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $328 | $599 | Not Implemented |
IA0264 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,239 | $5,199 | Not Implemented |
IA0264 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,676 | $0 | Implemented |
IA0264 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,730 | $44 | Not Implemented |
WV0210 # 14 Y:2001 | 14 | 2001 | IMPROVE SPACE COMFORT CONDITIONING | $49,770 | $18,000 | Not Implemented |
WV0210 # 13 Y:2001 | 13 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,000 | $1,212 | Not Implemented |
WV0210 # 12 Y:2001 | 12 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $20,000 | $24,000 | Not Implemented |
WV0210 # 11 Y:2001 | 11 | 2001 | REUSE SCRAP GLASS AS FEED STOCK | $180 | $0 | Implemented |
WV0210 # 10 Y:2001 | 10 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,622 | $0 | Implemented |
WV0210 # 09 Y:2001 | 09 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,808 | $4,423 | Implemented |
WV0210 # 08 Y:2001 | 08 | 2001 | USE OPTIMUM THICKNESS INSULATION | $8,599 | $7,303 | Not Implemented |
WV0210 # 07 Y:2001 | 07 | 2001 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $3,772 | $0 | Implemented |
WV0210 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,633 | $900 | Implemented |
WV0210 # 05 Y:2001 | 05 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,488 | $740 | Implemented |
WV0210 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,198 | $54 | Implemented |
WV0210 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,808 | $730 | Not Implemented |
WV0210 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $710 | $37 | Implemented |
WV0210 # 01 Y:2001 | 01 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,786 | $448 | Not Implemented |