IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

321

matching recommendations
Reset
SIC 2451 Mobile Homes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0366 # 05 Y:2000 05 2000 INSTALL TIMERS AND/OR THERMOSTATS $28,188 $1,410 Implemented
OR0366 # 04 Y:2000 04 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,570 $7,800 Not Implemented
OR0366 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $359 $1,200 Not Implemented
OR0366 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $365 $0 Implemented
OR0366 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,963 $0 Implemented
MS0136 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,570 $133 Not Implemented
MS0136 # 02 Y:1999 02 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $561 $334 Not Implemented
MS0136 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,618 $1,130 Not Implemented
MS0136 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,296 $3,418 Not Implemented
MS0136 # 05 Y:1999 05 1999 INSTALL SET-BACK TIMERS $717 $472 Not Implemented
MS0136 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $279,396 $26,310 Not Implemented
MS0135 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,827 $1,406 Implemented
MS0135 # 02 Y:1999 02 1999 USE PHOTOCELL CONTROLS $590 $334 Implemented
MS0135 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $381 $355 Implemented
MS0135 # 04 Y:1999 04 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $30,074 $1,180 Not Implemented
MS0135 # 05 Y:1999 05 1999 PAY BILLS ON TIME TO AVOID LATE FEES $983 $70 Implemented
MS0135 # 06 Y:1999 06 1999 PAY BILLS ON TIME TO AVOID LATE FEES $314 $25 Implemented
UF0212 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,198 $1,438 Implemented
UF0212 # 02 Y:1998 02 1998 ADD AREA LIGHTING SWITCHES $2,592 $1,614 Not Implemented
UF0212 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,912 $4,901 Implemented
UF0212 # 04 Y:1998 04 1998 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,314 $1,818 Implemented
UF0212 # 05 Y:1998 05 1998 REDUCE SCRAP PRODUCTION $74,273 $165,000 Implemented
UF0212 # 06 Y:1998 06 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $241,992 $1,794 Not Implemented
UF0212 # 07 Y:1998 07 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $176,631 $34,209 Not Implemented
ND0303 # 12 Y:1998 12 1998 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $134 $285 Not Implemented