IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,446

matching recommendations
Reset
SIC 249 Miscellaneous Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0600 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,357 $495 n/a
AS0600 # 03 Y:2025 03 2025 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $8,750 $276 n/a
AS0600 # 04 Y:2025 04 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,289 $15,555 n/a
AS0600 # 02 Y:2025 02 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $37,872 $274,416 n/a
AS0600 # 06 Y:2025 06 2025 PAY BILLS ON TIME TO AVOID LATE FEES $1,132 $39 n/a
AS0600 # 07 Y:2025 07 2025 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $312 $279 n/a
AS0600 # 01 Y:2025 01 2025 INSTALL AN UNINTERUPTABLE POWER SUPPLY $274,416 $2,377,539 n/a
DL0245 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,824 $1,592 n/a
DL0245 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $774 $0 n/a
DL0245 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,149 $0 n/a
DL0245 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,607 $6,000 n/a
DL0245 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,089 $9,630 n/a
DL0245 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,536 $53,470 n/a
LS2420 # 04 Y:2024 04 2024 UPGRADE CONTROLS ON COMPRESSORS $9,307 $21,000 n/a
LS2420 # 01 Y:2024 01 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $7,485 $0 n/a
LS2420 # 06 Y:2024 06 2024 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $11,877 $51,800 n/a
LS2420 # 05 Y:2024 05 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $24,642 $68,828 n/a
LS2420 # 03 Y:2024 03 2024 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,356 $15,100 n/a
LS2420 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,025 $25 n/a
NL0094 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $731 $2,110 Not Implemented
NL0094 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $332 $160 Not Implemented
NL0094 # 03 Y:2024 03 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,003 $2,741 Not Implemented
NL0094 # 01 Y:2024 01 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $72,558 $568,000 Not Implemented
NL0094 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,784 $4,500 Not Implemented
NL0094 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $635 $583 Not Implemented