IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,398

matching recommendations
Reset
SIC 249 Miscellaneous Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0466 # 07 Y:2013 07 2013 BURN WASTE OIL FOR HEAT $2,530 $4,000 Not Implemented
WV0466 # 08 Y:2013 08 2013 IMPROVE LUBRICATION PRACTICES $2,167 $1,000 Implemented
WV0466 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,160 $488 Implemented
WV0466 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,248 $30 Implemented
WV0466 # 11 Y:2013 11 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,129 $5,550 Not Implemented
WV0466 # 12 Y:2013 12 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,001 $113 Implemented
WV0466 # 13 Y:2013 13 2013 DEVELOP A REPAIR/REPLACE POLICY $477 $470 Implemented
UK1216 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,607 $4,607 Implemented
UK1216 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,150 $1,000 Implemented
UK1216 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $145,660 $993,792 Implemented
UK1216 # 04 Y:2013 04 2013 REPAIR AND ELIMINATE STEAM LEAKS $31,294 $26,400 Implemented
IP0009 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,407 $0 Implemented
IP0009 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,003 $920 Implemented
IP0009 # 03 Y:2013 03 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,258 $5,693 Not Implemented
IP0009 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,967 $25,082 Implemented
IP0009 # 05 Y:2013 05 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $5,706 $12,000 Not Implemented
IP0009 # 06 Y:2013 06 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,547 $15,000 Not Implemented
MA0702 # 01 Y:2012 01 2012 REDUCE FLUID FLOW RATES $11,375 $9,400 Implemented
MA0702 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,144 $1,500 Implemented
MA0702 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,102 $2,210 Not Implemented
MA0702 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $868 $3,000 Implemented
BD0415 # 01 Y:2012 01 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $78,417 $20,000 Not Implemented
BD0415 # 02 Y:2012 02 2012 INSTALL TURBULATORS $28,818 $1,500 Not Implemented
BD0415 # 03 Y:2012 03 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,920 $28,550 Implemented
BD0415 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,753 $2,000 Implemented