IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 249 Miscellaneous Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0424 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,125 $44,393 n/a
AS0424 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,418 $1,000 n/a
AS0424 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $2,909 $2,240 n/a
AS0424 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $6,478 $800 n/a
AS0365 # 08 Y:2003 08 2003 RECOVER AND REUSE WASTE MATERIAL $2,432 $1,059 n/a
AS0365 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $88,723 $78,120 Not Implemented
AS0365 # 06 Y:2003 06 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $274 $350 Implemented
AS0365 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $183 $30 Not Implemented
AS0365 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,328 $60 Implemented
AS0365 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $140 $450 Not Implemented
AS0365 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $1,535 Implemented
AS0365 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $790 $1,643 Implemented
AS0285 # 06 Y:2000 06 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,339 $2,000 Not Implemented
AS0285 # 05 Y:2000 05 2000 MODIFY STARTUP/SHUTDOWN TIMES $3,858 $120 Not Implemented
AS0285 # 04 Y:2000 04 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $216,399 $200,000 Not Implemented
AS0285 # 03 Y:2000 03 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,513 $960 Not Implemented
AS0285 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,526 $7,394 Not Implemented
AS0285 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,166 $1,549 Not Implemented