Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 249 | Miscellaneous Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0424 # 02 Y:2006 | 02 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,125 | $44,393 | n/a |
AS0424 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,418 | $1,000 | n/a |
AS0424 # 04 Y:2006 | 04 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,909 | $2,240 | n/a |
AS0424 # 01 Y:2006 | 01 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $6,478 | $800 | n/a |
AS0365 # 08 Y:2003 | 08 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $2,432 | $1,059 | n/a |
AS0365 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $88,723 | $78,120 | Not Implemented |
AS0365 # 06 Y:2003 | 06 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $274 | $350 | Implemented |
AS0365 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $183 | $30 | Not Implemented |
AS0365 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,328 | $60 | Implemented |
AS0365 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $140 | $450 | Not Implemented |
AS0365 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $290 | $1,535 | Implemented |
AS0365 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $790 | $1,643 | Implemented |
AS0285 # 06 Y:2000 | 06 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,339 | $2,000 | Not Implemented |
AS0285 # 05 Y:2000 | 05 | 2000 | MODIFY STARTUP/SHUTDOWN TIMES | $3,858 | $120 | Not Implemented |
AS0285 # 04 Y:2000 | 04 | 2000 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $216,399 | $200,000 | Not Implemented |
AS0285 # 03 Y:2000 | 03 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,513 | $960 | Not Implemented |
AS0285 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,526 | $7,394 | Not Implemented |
AS0285 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,166 | $1,549 | Not Implemented |