IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 249 Miscellaneous Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2403 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $53,533 $548,395 n/a
UL2403 # 08 Y:2024 08 2024 INSTALL SPECTRAL REFLECTORS / DELAMP $680 $0 n/a
UL2403 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,568 $3,839 n/a
UL2403 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $181 $779 n/a
UL2403 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,498 $1,785 n/a
UL2403 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,803 $0 n/a
UL2403 # 01 Y:2024 01 2024 RECOVER WASTE HEAT FROM EQUIPMENT $35,606 $77,327 n/a
UL2403 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $32,359 $12,025 n/a
UL2403 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,407 $9,750 n/a
UK1404 # 03 Y:2014 03 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $434 $300 Not Implemented
UK1404 # 07 Y:2014 07 2014 ADD AREA LIGHTING SWITCHES $331 $221 Not Implemented
UK1404 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $235 $500 Not Implemented
UK1404 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $297 $0 Implemented
UK1404 # 04 Y:2014 04 2014 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $300 $1,700 Not Implemented
UK1404 # 05 Y:2014 05 2014 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $1,300 $2,500 Implemented
UK1404 # 09 Y:2014 09 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $162 $0 Implemented
UK1404 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $359 $266 Not Implemented
UK1404 # 08 Y:2014 08 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $74 $17 Not Implemented
UK1216 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,607 $4,607 Implemented
UK1216 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,150 $1,000 Implemented
UK1216 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $145,660 $993,792 Implemented
UK1216 # 04 Y:2013 04 2013 REPAIR AND ELIMINATE STEAM LEAKS $31,294 $26,400 Implemented
TT0084 # 06 Y:2012 06 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $115 $10 Implemented
TT0084 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,504 $4,500 Not Implemented
TT0084 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,245 $3,500 Not Implemented