IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
SIC 249 Miscellaneous Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0626 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,701 $160 Implemented
WV0626 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $7,261 $14,000 Not Implemented
WV0626 # 09 Y:2022 09 2022 DEVELOP A REPAIR/REPLACE POLICY $291 $1,347 Implemented
WV0626 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $301 $40 Implemented
WV0626 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $454 $467 Implemented
WV0626 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $792 $3,586 Implemented
WV0626 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $1,324 $3,185 Not Implemented
WV0626 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,860 $7,799 Implemented
WV0626 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,566 $12,480 Not Implemented
WV0557 # 12 Y:2018 12 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $508 $2,480 Implemented
WV0557 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $65,760 $117,200 Implemented
WV0557 # 02 Y:2018 02 2018 REPAIR AND ELIMINATE STEAM LEAKS $43,281 $33,600 Implemented
WV0557 # 03 Y:2018 03 2018 ADD AREA LIGHTING SWITCHES $22,313 $25,000 Not Implemented
WV0557 # 11 Y:2018 11 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,022 $1,365 Not Implemented
WV0557 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $13,930 $2,320 Implemented
WV0557 # 08 Y:2018 08 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,390 $1,950 Not Implemented
WV0557 # 10 Y:2018 10 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,424 $90 Not Implemented
WV0557 # 05 Y:2018 05 2018 UPGRADE CONTROLS ON COMPRESSORS $14,479 $27,450 Implemented
WV0557 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $3,480 $16,000 Not Implemented
WV0557 # 09 Y:2018 09 2018 MINIMIZE WATER USAGE $2,486 $5,600 Not Implemented
WV0557 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,808 $0 Not Implemented
WV0444 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,137 $15,286 Implemented
WV0444 # 03 Y:2012 03 2012 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,848 $1,560 Not Implemented
WV0444 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,498 $8,040 Not Implemented
WV0444 # 10 Y:2012 10 2012 DEVELOP A REPAIR/REPLACE POLICY $1,353 $838 Implemented