IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2493 Reconstituted Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0565 # 02 Y:2004 02 2004 $57,540 $40,000 Implemented
MA0565 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,088 $8,000 Not Implemented
MA0565 # 04 Y:2004 04 2004 REPLACE BOILER $2,760 $750 Implemented
MA0565 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,705 $754 Implemented
MA0565 # 06 Y:2004 06 2004 INSULATE FEEDWATER TANK $873 $300 Implemented
MA0565 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $656 $548 Not Implemented
MA0565 # 01 Y:2004 01 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $216,000 $125,000 Implemented
ME0215 # 09 Y:1997 09 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $12,790 $10,531 Not Implemented
ME0215 # 08 Y:1997 08 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $488 $215 Implemented
ME0215 # 07 Y:1997 07 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,102 $1,308 Not Implemented
ME0215 # 06 Y:1997 06 1997 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,268 $0 Not Implemented
ME0215 # 05 Y:1997 05 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,736 $1,233 Not Implemented
ME0215 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,285 $330 Implemented
ME0215 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,413 $9,426 Not Implemented
ME0215 # 02 Y:1997 02 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,349 $979 Not Implemented
ME0215 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $9,522 $18,574 Not Implemented
ME0172 # 07 Y:1995 07 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $445 $820 Implemented
ME0172 # 06 Y:1995 06 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $822 $1,540 Not Implemented
ME0172 # 05 Y:1995 05 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,680 $1,600 Not Implemented
ME0172 # 04 Y:1995 04 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,356 $5,000 Not Implemented
ME0172 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,141 $2,140 Implemented
ME0172 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,895 $900 Not Implemented
ME0172 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,130 $600 Implemented