Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 2499 | Wood Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0626 # 09 Y:2022 | 09 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $291 | $1,347 | Implemented |
WV0626 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $301 | $40 | Implemented |
WV0626 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $454 | $467 | Implemented |
WV0626 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $1,324 | $3,185 | Not Implemented |
WV0626 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $792 | $3,586 | Implemented |
WV0626 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,701 | $160 | Implemented |
WV0626 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,860 | $7,799 | Implemented |
WV0626 # 04 Y:2022 | 04 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,566 | $12,480 | Not Implemented |
WV0626 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,261 | $14,000 | Not Implemented |
WV0557 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $13,930 | $2,320 | Implemented |
WV0557 # 05 Y:2018 | 05 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $14,479 | $27,450 | Implemented |
WV0557 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $3,480 | $16,000 | Not Implemented |
WV0557 # 11 Y:2018 | 11 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,022 | $1,365 | Not Implemented |
WV0557 # 10 Y:2018 | 10 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,424 | $90 | Not Implemented |
WV0557 # 09 Y:2018 | 09 | 2018 | MINIMIZE WATER USAGE | $2,486 | $5,600 | Not Implemented |
WV0557 # 08 Y:2018 | 08 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,390 | $1,950 | Not Implemented |
WV0557 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,808 | $0 | Not Implemented |
WV0557 # 12 Y:2018 | 12 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $508 | $2,480 | Implemented |
WV0557 # 01 Y:2018 | 01 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $65,760 | $117,200 | Implemented |
WV0557 # 03 Y:2018 | 03 | 2018 | ADD AREA LIGHTING SWITCHES | $22,313 | $25,000 | Not Implemented |
WV0557 # 02 Y:2018 | 02 | 2018 | REPAIR AND ELIMINATE STEAM LEAKS | $43,281 | $33,600 | Implemented |
WV0028 # 05 Y:1994 | 05 | 1994 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $9,115 | $680 | Not Implemented |
WV0028 # 06 Y:1994 | 06 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $904 | $0 | Not Implemented |
WV0028 # 07 Y:1994 | 07 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $657 | $377 | Not Implemented |
WV0028 # 08 Y:1994 | 08 | 1994 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,456 | $1,172 | Not Implemented |