Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 2499 | Wood Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0167 # 08 Y:1999 | 08 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $25,000 | $1,000 | Implemented |
NC0167 # 07 Y:1999 | 07 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $43,740 | $9,500 | Not Implemented |
NC0167 # 06 Y:1999 | 06 | 1999 | BURN WOOD BY-PRODUCTS FOR HEAT | $22,545 | $80,500 | Not Implemented |
NC0167 # 05 Y:1999 | 05 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $503 | $143 | Implemented |
NC0167 # 04 Y:1999 | 04 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,229 | $5,323 | Implemented |
NC0167 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $489 | $1,100 | Not Implemented |
NC0167 # 02 Y:1999 | 02 | 1999 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,230 | $19,535 | Not Implemented |
NC0167 # 01 Y:1999 | 01 | 1999 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,244 | $2,400 | Implemented |
ME0258 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,192 | $8,181 | Not Implemented |
ME0258 # 10 Y:1999 | 10 | 1999 | INSULATE BARE EQUIPMENT | $110 | $220 | Not Implemented |
ME0258 # 09 Y:1999 | 09 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $358 | $1,855 | Not Implemented |
ME0258 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $21,564 | $47,350 | Not Implemented |
ME0258 # 07 Y:1999 | 07 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $715 | $1,372 | Not Implemented |
ME0258 # 06 Y:1999 | 06 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $1,300 | $890 | Not Implemented |
ME0258 # 04 Y:1999 | 04 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,990 | $295 | Not Implemented |
ME0258 # 03 Y:1999 | 03 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $20,000 | $1,200 | Not Implemented |
ME0258 # 02 Y:1999 | 02 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $74,945 | $21,400 | Not Implemented |
ME0258 # 01 Y:1999 | 01 | 1999 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $75,000 | $106,500 | Not Implemented |
HO0191 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,167 | $5,870 | Implemented |
HO0191 # 09 Y:1999 | 09 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,125 | $1,000 | Not Implemented |
HO0191 # 08 Y:1999 | 08 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $450 | $1,000 | Implemented |
HO0191 # 07 Y:1999 | 07 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,125 | $500 | Implemented |
HO0191 # 06 Y:1999 | 06 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $4,160 | $1,320 | Not Implemented |
HO0191 # 05 Y:1999 | 05 | 1999 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,245 | $1,500 | Not Implemented |
HO0191 # 04 Y:1999 | 04 | 1999 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $875 | $400 | Implemented |