IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2499 Wood Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0167 # 08 Y:1999 08 1999 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $25,000 $1,000 Implemented
NC0167 # 07 Y:1999 07 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $43,740 $9,500 Not Implemented
NC0167 # 06 Y:1999 06 1999 BURN WOOD BY-PRODUCTS FOR HEAT $22,545 $80,500 Not Implemented
NC0167 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $503 $143 Implemented
NC0167 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,229 $5,323 Implemented
NC0167 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $489 $1,100 Not Implemented
NC0167 # 02 Y:1999 02 1999 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,230 $19,535 Not Implemented
NC0167 # 01 Y:1999 01 1999 ADJUST BURNERS FOR EFFICIENT OPERATION $1,244 $2,400 Implemented
ME0258 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,192 $8,181 Not Implemented
ME0258 # 10 Y:1999 10 1999 INSULATE BARE EQUIPMENT $110 $220 Not Implemented
ME0258 # 09 Y:1999 09 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $358 $1,855 Not Implemented
ME0258 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $21,564 $47,350 Not Implemented
ME0258 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $715 $1,372 Not Implemented
ME0258 # 06 Y:1999 06 1999 INSTALL SYSTEM TO COLLECT SCRAP $1,300 $890 Not Implemented
ME0258 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $8,990 $295 Not Implemented
ME0258 # 03 Y:1999 03 1999 RECOVER AND REUSE WASTE MATERIAL $20,000 $1,200 Not Implemented
ME0258 # 02 Y:1999 02 1999 MOVE PRODUCT USING MECHANICAL MEANS $74,945 $21,400 Not Implemented
ME0258 # 01 Y:1999 01 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $75,000 $106,500 Not Implemented
HO0191 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,167 $5,870 Implemented
HO0191 # 09 Y:1999 09 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,125 $1,000 Not Implemented
HO0191 # 08 Y:1999 08 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $450 $1,000 Implemented
HO0191 # 07 Y:1999 07 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,125 $500 Implemented
HO0191 # 06 Y:1999 06 1999 INSTALL SYSTEM TO COLLECT SCRAP $4,160 $1,320 Not Implemented
HO0191 # 05 Y:1999 05 1999 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,245 $1,500 Not Implemented
HO0191 # 04 Y:1999 04 1999 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $875 $400 Implemented