IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,700

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0363 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,145 $1,980 Implemented
MI0363 # 08 Y:2019 08 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,001 $240 Implemented
UK1913 # 10 Y:2019 10 2019 OPTIMIZE PLANT POWER FACTOR $15,097 $10,570 Implemented
UK1913 # 08 Y:2019 08 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $243 $127 Implemented
UK1913 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,770 $32,561 Implemented
UK1913 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $333 $1,120 Implemented
UK1913 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,111 $550 Implemented
UK1913 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,642 $2,520 Implemented
UK1913 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,855 $2,510 Implemented
NC0634 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,566 $850 Implemented
NC0634 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,879 $25,678 Implemented
AS0473 # 03 Y:2019 03 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,599 $9,044 Implemented
AS0473 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $2,803 Implemented
AS0473 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $699 $1,891 Implemented
CL1809 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $21,846 $250 Implemented
CL1809 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,602 $11,662 Implemented
SF0521 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,001 $1,610 Implemented
SF0521 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $130 $44 Implemented
SF0521 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,444 $3,798 Implemented
SF0521 # 04 Y:2018 04 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,084 $2,146 Implemented
SF0521 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,270 $22,190 Implemented
SF0521 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,634 $44,294 Implemented
SF0521 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,263 $61,175 Implemented
SF0521 # 08 Y:2018 08 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $94,006 $487,058 Implemented
AM0750 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $6,550 $9,100 Implemented