IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,700

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0171 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $587 $300 Implemented
ME0171 # 08 Y:1995 08 1995 MINIMIZE WATER USAGE $14,688 $1,600 Implemented
MS0041 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $216 $742 Implemented
MS0041 # 04 Y:1995 04 1995 INSTALL TIMERS AND/OR THERMOSTATS $251 $160 Implemented
MS0039 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $624 $321 Implemented
MS0039 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,508 $10,000 Implemented
MS0039 # 05 Y:1995 05 1995 USE PHOTOCELL CONTROLS $434 $260 Implemented
MS0039 # 06 Y:1995 06 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,365 $3,000 Implemented
ME0169 # 06 Y:1995 06 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,205 $400 Implemented
ME0169 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $919 $1,000 Implemented
KG0034 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,463 $9,895 Implemented
SF0068 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,248 $20,160 Implemented
SF0068 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $2,174 $3,300 Implemented
SF0068 # 03 Y:1995 03 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $12,233 $1,000 Implemented
SF0068 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,062 $2,666 Implemented
SF0068 # 05 Y:1995 05 1995 USE SYNTHETIC LUBRICANT $847 $2,867 Implemented
SF0068 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,141 $1,587 Implemented
SF0068 # 07 Y:1995 07 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,680 $62,972 Implemented
SF0068 # 08 Y:1995 08 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,266 $7,015 Implemented
SF0068 # 09 Y:1995 09 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,731 $6,605 Implemented
SF0068 # 10 Y:1995 10 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,393 $700 Implemented
SF0068 # 11 Y:1995 11 1995 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $6,972 $9,060 Implemented
SF0068 # 12 Y:1995 12 1995 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $3,888 $14,750 Implemented
MS0035 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $817 $50 Implemented
MS0035 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $5,164 $2,130 Implemented