Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0944 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,222 $1,107 Implemented
OK0754 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,311 $814 Implemented
OK0754 # 07 Y:2007 07 2007 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $32,400 $320 Implemented
OK0754 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,351 $4,638 Implemented
OK0754 # 09 Y:2007 09 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $8,086 $0 Implemented
OK0683 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $8,063 $7,713 Implemented
OK0683 # 07 Y:2004 07 2004 INSTALL SET-BACK TIMERS $19,818 $8,100 Implemented
OK0679 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,737 $1,067 Implemented
OK0679 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,675 $3,067 Implemented
AR0186 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $17,663 $54,855 Implemented
AR0186 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,117 $23,976 Implemented
AR0178 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,932 $500 Implemented
AR0178 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $511 $936 Implemented
AR0178 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $658 $1,768 Implemented
AR0178 # 04 Y:1999 04 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $341 $0 Implemented
AR0178 # 05 Y:1999 05 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,779 $19,000 Implemented
AR0152 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $613 $210 Implemented
AR0152 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $755 $0 Implemented
AR0152 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,840 $240 Implemented
AR0152 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $7,507 $125 Implemented
AR0139 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $439 $793 Implemented
AR0139 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,785 $0 Implemented
AR0139 # 06 Y:1998 06 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $11,200 $3,665 Implemented
AR0139 # 07 Y:1998 07 1998 INSTALL MAGAZINES FOR TEMPORARY STORAGE $38,400 $7,000 Implemented
AR0139 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,835 $710 Implemented