IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,513

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0382 # 06 Y:2011 06 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $17,682 $21,309 Not Implemented
UM0382 # 07 Y:2011 07 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,797 $31,000 Not Implemented
NC0419 # 01 Y:2011 01 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $967 $25 Implemented
NC0419 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,212 $2,582 Not Implemented
NC0419 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $174 $50 Implemented
NC0419 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $363 $100 Implemented
NC0419 # 05 Y:2011 05 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $873 $50 Implemented
NC0419 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $139 $517 Implemented
MI0198 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,683 $55,919 Implemented
MI0198 # 02 Y:2010 02 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $37,497 $39,695 Not Implemented
MI0198 # 03 Y:2010 03 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,892 $2,000 Implemented
MI0198 # 04 Y:2010 04 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,048 $13,338 Implemented
MI0198 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $5,576 $14,400 Implemented
MI0198 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,870 $1,210 Implemented
MI0198 # 07 Y:2010 07 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,644 $11,985 Not Implemented
MI0198 # 08 Y:2010 08 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,407 $40 Implemented
NC0415 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,456 $3,200 Implemented
NC0415 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $937 $50 Not Implemented
NC0415 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,465 $500 Not Implemented
NC0415 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $146 $50 Implemented
NC0415 # 05 Y:2010 05 2010 DEVELOP A REPAIR/REPLACE POLICY $911 $1,846 Implemented
NC0415 # 06 Y:2010 06 2010 $12,000 $1,000 Implemented
NC0415 # 07 Y:2010 07 2010 $8,000 $15,750 Implemented
MS0368 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,581 $54,086 Implemented
UA3002 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,042 $4,063 Not Implemented