IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0451 # 03 Y:1992 03 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,144 $1,475 Not Implemented
TN0451 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,141 $440 Not Implemented
TN0399 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,222 $2,750 Implemented
TN0399 # 02 Y:1990 02 1990 REDUCE VENTILATION AIR $5,547 $5,692 Not Implemented
TN0399 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $825 $687 Implemented
TN0399 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,844 $900 Implemented
TN0399 # 05 Y:1990 05 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,555 $16,100 Not Implemented
TN0399 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,873 $185 Implemented
TN0399 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $416 $96 Implemented
TN0399 # 08 Y:1990 08 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $813 $680 Implemented
TN0399 # 09 Y:1990 09 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $583 $210 Implemented
TN0399 # 10 Y:1990 10 1990 OPTIMIZE PLANT POWER FACTOR $4,690 $5,900 Not Implemented
TN0355 # 01 Y:1988 01 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,038 $18,500 Not Implemented
TN0355 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,104 $750 Implemented
TN0355 # 03 Y:1988 03 1988 KEEP LAMPS AND REFLECTORS CLEAN $9,501 $19,134 Not Implemented
TN0355 # 04 Y:1988 04 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,015 $4,840 Implemented
TN0355 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,400 $0 Implemented
TN0355 # 06 Y:1988 06 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,943 $1,220 Implemented
TN0355 # 07 Y:1988 07 1988 DISCONNECT BALLASTS $1,320 $2,321 Implemented
TN0355 # 08 Y:1988 08 1988 IMPROVE LUBRICATION PRACTICES $1,071 $0 Implemented
TN0355 # 09 Y:1988 09 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,046 $360 Not Implemented
TN0299 # 01 Y:1987 01 1987 INSULATE BARE EQUIPMENT $1,498 $429 Implemented
TN0299 # 02 Y:1987 02 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,301 $2,000 Implemented
TN0299 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,747 $165 Implemented
TN0299 # 04 Y:1987 04 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $453 $1,192 Implemented