IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,525

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0166 # 01 Y:2000 01 2000 SHUT OFF PILOTS IN STANDBY EQUIPMENT $190 $70 Implemented
MS0166 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $551 $222 Not Implemented
MS0166 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,903 $3,464 Not Implemented
MS0166 # 04 Y:2000 04 2000 INSTALL TIMERS AND/OR THERMOSTATS $311 $472 Not Implemented
MS0166 # 05 Y:2000 05 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $1,157 $376 Not Implemented
MS0166 # 06 Y:2000 06 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,439 $7,938 Not Implemented
MS0166 # 07 Y:2000 07 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $29,386 $2,399 Not Implemented
AR0186 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,117 $23,976 Implemented
AR0186 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,772 $800 Not Implemented
AR0186 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $17,663 $54,855 Implemented
AR0186 # 04 Y:2000 04 2000 RECYCLE NONFERROUS DUST $28,860 $0 Not Implemented
AR0186 # 05 Y:2000 05 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $26,957 $400 Not Implemented
MS0160 # 01 Y:2000 01 2000 BURN A LESS EXPENSIVE GRADE OF FUEL $2,113 $710 Not Implemented
MS0160 # 02 Y:2000 02 2000 USE SYNTHETIC LUBRICANT $1,840 $1,210 Implemented
MS0160 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $469 $472 Not Implemented
MS0160 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,075 $9,610 Not Implemented
MS0160 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $593 $3,002 Not Implemented
MS0160 # 06 Y:2000 06 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $915 $2,700 Not Implemented
MS0160 # 07 Y:2000 07 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,708 $2,195 Not Implemented
MS0160 # 08 Y:2000 08 2000 COMBINE UTILITY METERS $3,023 $1,000 Not Implemented
MS0160 # 09 Y:2000 09 2000 BURN WASTE OIL FOR HEAT $1,949 $2,067 Not Implemented
NC0188 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $600 $440 Implemented
NC0188 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $526 $1,623 Not Implemented
NC0188 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,067 $6,800 Not Implemented
NC0188 # 04 Y:2000 04 2000 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $2,795 $1,500 Not Implemented